Case Studies
Case Study
Royal Botanic Gardens Kew
Set within the unique setting of the Royal Botanic Gardens Kew, the Children’s Garden is a dedicated space for fun, exploring, play and learning and one of the most ambitious projects in the Botanic Gardens last decade.
Read more
Case Study
Great Linford Manor Park
Supporting the Parks Trust to 'Reveal, Revive & Restore' a historic park
Read more
Case Study
Jaguar Land Rover (JLR)
Creating a landscape to bring the beauty of the surrounding Warwickshire countryside on-site with distinctive sense of place.
Read more
Case Study
Forty Hall
Within the grounds of this Grade 1 Listed Manor House and Scheduled Ancient Monument Status we worked to restore the grounds and historical features to their original layout and enhance the overall landscaping under Archaeological and Environmental watching briefs.
Read more
Case Study
Little Cowbridge
An in-house project creating over 22 acres of new woodland from existing pastureland in Essex with over 22,000 native trees and shrubs planted to create a new, multi-functional, broadleaf woodland
Read more
Case Study
Woodhouse Urban Park
Woodhouse Urban Park is an important part of the regeneration of South Kilburn, transforming the area and creating a real sense of place and a better place to live.
Read more
Case Study
Alder Hey Children's Hospital
Designing a functional tranquility garden to provide a functional space with access to fresh air and nature.
Read more
Case Study
Stanborough Park Water Play Area
Collaborating with specialist contractors and the local community, the project created a new outdoor water park for children, with new public facilities, and a traditional play area.
Read more
Case Study
Hinkley Point Connection Project
A National Grid partnership carrying out the large scale landscaping for the 340 square kilometers Hinkley Point Connection Project.
Read more
Case Study
Longbridge Retail Park
Reprofile the green spaces at their Longbridge Headquarters to “create green spaces suitable for their staff to enjoy and relax in".
Read more
Case Study
Nine Elms Point
Providing greenery for residents, and a place where they can escape from busy lifestyles and reconnect with nature above the rooftops of Central London.
Read more
Case Study
Monksmoor Park, Daventry
A newly created community situated within Daventry developed by Crest Nicholson. Ground Control have been appointed to extend the existing country park and provide community access routes to the woodland and meadow areas.
Read more
Case Study
Get Cumbria Buzzing
Supporting and consulting National Highways and Cumbria Wildlife Trust (CWT) in a funding application to HLF for the Get Cumbria Buzzing Campaign.
Read more
Case Study
Inverness Campus
A high specification hard and soft landscaping infrastructure project which services business, research, and educational units within the 215-acre campus.
Read more
Case Study
PSA Dealerships
2020 saw many more Electric Vehicles come on to the market and one of the biggest dealership groups PSA wanted to be ready for the launch of their new range
Read more
Case Study
Pinner Park Primary School
Inviting nature back to Pinner Park Primary School, and raising biodiversity awareness with hands-on experiences
Read more
Case Study
Biodiversity at the Industrial Estate
Transforming wasteland into beautiful, biodiverse habitats
Read more
Case Study
Mini allotments at office roof gardens
Empowering workplace wellbeing and environmental sustainability
Read more
Case Study
Workplace charging
Helping businesses meeting their sustainability goals by Installing EV charging facilities.
Read more
Case Study
An award-winning planting legacy
A planting partnership with Severn Trent for the 2022 Commonwealth Games, planting 72 Earthwatch Tiny Forests and 2022 acres of new woodland
Read more
Case Study
Connecting communities on the Northumberland Line
Repurposing left-over materials from vegetation clearance for outdoor community use
Read more
Case Study
National Maritime Museum
Harnessing innovation to safely maintain the grounds of one of the UKs most popular museums and World Heritage Site
Read more
Case Study
Cross A Moor
Improving essential infrastructure to reduce congestion, improve safety and support 1000 new homes.
Read more
Case Study
Putting EV Charging on the map with Ordnance Survey
Upgrading infrastructure and mapping an EV future at OS Head Office
Read more
Case Study
Edible Science: Kew’s Kitchen Garden
Revamping the popular 'Edible Science: Kew’s Kitchen Garden' and creating an enhanced visitor experience for groups and events
Read more
Case Study
A Pioneering Partnership with JLL
Pioneering better landscapes, outside spaces and nature-based solutions at nationwide JLL facilities
Read more
Case Study
Urban Beekeeping at London Metropolitan University
Supporting CBRE in saving the resident urban bee populations
Read more
Case Study
Sumpter Yard Revived, St Albans Cathedral
Reviving the Cathedrals east-end, Sumpter Yard, to create a beautiful, accessible, and welcoming approach through a walled garden.
Read more
Case Study
Biodiversity enhancements with National Highways
An award-winning biodiversity net gain project along the A120
Read more
Case Study
Decarbonising Kingfisher House
Sharing the decarbonisation journey of Ground Control's head office
Read more